Main station|Member Center|Save the desktop|Mobile browsing
Ordinary Member

CMT Architectural Research Institute (Shanghai) Co

House inspection Glass curtain wall inspection Grout Nondestructive testing D...

sell
  • There is no classification
contact
  • Contact:肖小姐
  • Phone:021-51870573
  • Email:974081947@qq.com
  • fax:021-60917730
search
 
link
  • There is no link yet
home > sell > Shanghai building curtain wall inspection phone number
Shanghai building curtain wall inspection phone number
products: Views:5Shanghai building curtain wall inspection phone number 
brand: 上海建筑幕墙检测电话
price: 面议
MOQ:
Total supply:
Delivery date: Shipped within 3 days from the date of payment by the buyer
Valid until: Long-term validity
Last updated: 2015-01-08 17:49
 
Details
Shanghai building curtain wall inspection phone number
: Specializing in various performance inspections for the safety and reliability of building curtain walls. The safety performance inspection and evaluation of glass curtain walls includes the following contents:
: Detection of glass curtain wall materials
: Verification of structural bearing capacity of glass curtain wall
: Inspection of structure and structure of glass curtain wall
:
: According to the relevant content of "Construction Quality Acceptance Specification for Building Energy-saving Projects" B, the curtain wall energy-saving project uses When material components enter the site, the following properties should be re-inspected. The re-inspection should be witnessed and sampled for inspection:
: Insulation material: thermal conductivity density.
: Curtain wall glass: visible light transmittance, heat transfer coefficient, shading coefficient, insulating glass dew point.
: Insulation profiles: tensile strength and shear strength.
: The air-tightness performance of the curtain wall should meet the grade requirements specified in the design. When the curtain wall area is greater than or % of the building exterior wall area, materials and accessories should be extracted on site, and test pieces should be installed and produced in the testing laboratory for air tightness performance testing (the air tightness testing test pieces should include typical units of the curtain wall, typical joints, typical possible Open part), the test piece should be designed according to the curtain wall engineering construction drawings. The design of the specimen should be approved and confirmed by the project supervisory engineer of the construction design unit, and the test results should meet the grade requirements specified in the design.
:
: Three Glass Curtain Wall Inspection Specifications
: "Glass Curtain Wall Engineering Quality Inspection Standards"/
: "Glass Curtain Wall Engineering Technical Specifications"
: "Building Decoration and Decoration Project Quality Acceptance Specifications》B
:《Building Curtain Wall》B/
:
: MCC Construction Research Institute (Shanghai) Co., Ltd. Housing Quality Inspection Station
: China Jingye Engineering Technology Co., Ltd.
: Address: Fortune International Plaza Ginza, No. Guoquan Road, Yangpu District
: House inspection, earthquake resistance appraisal, engineering design, general contracting, real estate development
: Contact person: Xiao Xiaojing
: Telephone:
: Fax:
: :@
: Instant messaging:
:

Request for quotation
A total of0articles  Related Comments: